Building Regulations Part H

Building Regulations Part H

The UK Building Regulations part H covers the requirements with respect to drainage and waste disposal at sites. Ensuring that a development complies with these is critical. Our designs will assist in relation to H1 to H5. As per the following sections: H1. Foul water drainage An adequate system of drainage should be provided to carry foul water from appliances within the building to either a public sewer, private sewer, septic tank or cesspool.  H2. Wastewater treatment systems and cesspools This section deals with the design and siting...

read more

Pumping stations,septic tanks and treatment works

Pumping stations,septic tanks and treatment works

We are happy to provide independent professional advice on any of the following: Public / Adoptable pumping stations Private pumping stations Septic tanks and cesspools Treatment works Field treatment drain or other natural reed bed systems Our Director Stephen Gibson is a former Lead Design Engineer for the UK's largest water company – Thames Water Engineering. My experience with Thames Water should be invaluable in providing good professional advice in relation to sites with existing sewerage problems or where new sewerage...

read more
close
YouTube IconTwitter IconVisit Our LinkedIn Civil Engineering Profile Visit Our LinkedIn Civil Engineering Profile