Gatwick Airport Radar Tower avoids Christmas 2013 River Mole Flood

Gatwick Airport Radar Tower avoids Christmas 2013 River Mole Flood

The floods at Gatwick Airport around Christmas 2013 in relation to the River Mole caused considerable disruption when an electrical substation flooded. Such disruption to key infrastructure is completely unnecessary if competent Civil Engineering Consultants are employed to assess sites and produce appropriate flood mitigation solutions.  At Wilsham Consulting our Engineers have experience of flood mitigation design for a wide range of clients, from domestic sites to key infrastructure. A good example of this is the NATS Gatwick Airport...

read more
close
YouTube IconTwitter IconVisit Our LinkedIn Civil Engineering Profile Visit Our LinkedIn Civil Engineering Profile